Application of the Pattern of Construction Management Contract in Large-scale Project in Shanghai[J]. Journal of Civil and Environmental Engineering, 2007, 29(5): 159-163.
DOI:
Application of the Pattern of Construction Management Contract in Large-scale Project in Shanghai[J]. Journal of Civil and Environmental Engineering, 2007, 29(5): 159-163. DOI: 10.11835/j.issn.1674-4764.2007.05.032.
Application of the Pattern of Construction Management Contract in Large-scale Project in Shanghai
This article states systematically the fundamental conception of the mode of construction management general contract
the contract structure and the organization structure through the analysis of the construction characteristics of Shanghai large-scale projects
considering the situation of China and the characteristics of this line. It also summarizes the characteristics of the mode of construction management general contract through the example of the Pudong International Airport Construction. The mode of construction management general contract not only meets the needs of construction technique in bettering the design of construction project building
but also releases the pressure in middle and later management of construction project building and overcomes the deficiency of the long-term building period
hard-to-control investigation brought by the problem of design
purchase
construction divided from and restricted by each other existed in the traditional contract mode. It also helps the contractor to provide socialized
specialized
commoditized service for the contractor. Helps to overall arrangement
economized investment
management level improve ment can be given. So it has the superiority in super large-scale projects construction compared with the traditional construction management.