MO Nanming, GUO Jingjun. A Transfer Precision Study of Interior Horizontal Coordinates of Oblique Super HighRise Buildings[J]. Journal of Civil and Environmental Engineering, 2008, 30(4): 91-95.
DOI:
MO Nanming, GUO Jingjun. A Transfer Precision Study of Interior Horizontal Coordinates of Oblique Super HighRise Buildings[J]. Journal of Civil and Environmental Engineering, 2008, 30(4): 91-95. DOI: 10.11835/j.issn.1674-4764.2008.04.020.
A Transfer Precision Study of Interior Horizontal Coordinates of Oblique Super HighRise Buildings
When staking out super highrise building construction
it is important to analyze the horizontal coordinate precision of the control point of the axis. For coordinate transfer of control points of oblique super highrise buildings with high accuracy and precision
methods combining the electronic tachometer with laser aligner were adopted. The measurement sections were transited by sections many times on the floors. The coordinates of control points of lower floors gradually were transferred to the top floor by relays. We then could use the electronic tachometer to measure the linear distance between the control points of each floor and the control point of the axis
calculate the coordinates of the axis control point
and analyze the precision of the coordinates. Thus
integrated methods of transferring horizontal coordinates of super highrise buildings setting out of axis repeatedly can be taken from the control points to the monitoring points section by section. The precision integrated methods improve the coordinates of the control point of the axis by adopting advanced measurement equipment. We recommend choosing an electronic tachometer with different precision and a laser aligner to analyze the control point error quickly and accurately
provide a complete and systematic method for optimizing the stakingout scheme in construction
and guide the stakingout work and deformation monitoring work of super highrise buildings or oblique super highrise building construction.