GUO Jinsong, PAN Yingya, WANG Chunyan, et al. Productive Commissioning of CASS Process Treating Sewage in Plateau Region[J]. Journal of Civil and Environmental Engineering, 2009, 31(4): 112-116.
DOI:
GUO Jinsong, PAN Yingya, WANG Chunyan, et al. Productive Commissioning of CASS Process Treating Sewage in Plateau Region[J]. Journal of Civil and Environmental Engineering, 2009, 31(4): 112-116. DOI: 10.11835/j.issn.1674-4764.2009.04.022.
Productive Commissioning of CASS Process Treating Sewage in Plateau Region
Productive commissioning of treating sewage in plateau region has the features of low temperature
low atmosphere pressure and low oxygen concentration. The CASS process was applied in the expansion of wastewater treatment plant in ShangriLa. Aiming at the low air temperature and low atmosphere pressure and the low concentration of influent
several approaches
such as adjusting the aeration mode compatibly
controlling the contents of dissolved oxygen and cultivating active sludge with warm maintenance
were studies for system stable operation under the condition of mismatch between design parameters and operation mode. With the field test
when the water quality of influent was: CODCr:50.0~164.0 mg/L
SS:30.0~123.0 mg/L
TN:7.0~82.6 mg/L
NH3N:1.9~39.2 mg/L
TP:0.6~3.2 mg/L
the quality of effluent was: CODCr:10.0~49.0 mg/L
SS:5.0~22.0 mg/L
TN:3.4~22.7 mg/L
NH3N:0.9~11.1 mg/L
TP:0.1~1.8 mg/L
in which the standard of the level B in class I were achieved according to Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918-2002).