Analysis on Predictive Methods of BIM Based on Construction Schedule Reliability
更新时间:2023-11-25
    • Analysis on Predictive Methods of BIM Based on Construction Schedule Reliability

    • Journal of Civil, Architectural & Environmental Engineering   Vol. 36, Issue 4, Pages: 51-56(2014)
    • DOI:10.11835/j.issn.1674-4764.2014.04.008    

      CLC:
    • Received:20 October 2013

      Published:25 August 2014

    移动端阅览

  • Yong Li. Analysis on Predictive Methods of BIM Based on Construction Schedule Reliability[J]. Journal of Civil, Architectural & Environmental Engineering, 2014, 36(4): 51-56. DOI: 10.11835/j.issn.1674-4764.2014.04.008.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

5

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Gaussian active learning algorithm for extreme event estimation
Prediction model for horizontal axis deviation of segment during construction stage of small curvature radius shield tunnel
Prediction model of ground settlement caused by construction of double track parallel shield tunnels under arbitrary layout
Intelligent design of rural light steel frame structure based on BIM and simulated annealing algorithm
Machine learning method for overall stability of welded constant section box columns made of high strength steel

Related Author

HU Ruiqing
YANG Cheng
HUANG Yanwen
YIN Weihao
YANG Haiting
ZHU Chunzhou
ZOU Jinfeng
WANG Chao

Related Institution

School of Civil Engineering, Southwest Jiaotong University
Land Traffic Geological Disaster Prevention Technology National Engineering Research Center, Southwest Jiaotong University
China Railway First Survey and Design Institute Group Co., Ltd.
China Railway Shanghai Design Institute Group Co., Ltd.
School of Civil Engineering, Central South University
0