您当前的位置:
首页 >
文章列表页 >
Estimation of ground settlement induced by shield tunnel excavation based on the time-space relationship
更新时间:2023-11-25
    • Estimation of ground settlement induced by shield tunnel excavation based on the time-space relationship

    • Journal of Civil and Environmental Engineering   Vol. 41, Issue 1, Pages: 62-69(2019)
    • DOI:10.11835/j.issn.2096-6717.2019.008    

      CLC:
    • Received:17 April 2018

      Published:2019-02

    移动端阅览

  • Zhide Wang, Limin Jiang, Yu Rao. Estimation of ground settlement induced by shield tunnel excavation based on the time-space relationship[J]. Journal of Civil and Environmental Engineering, 2019, 41(1): 62-69. DOI: 10.11835/j.issn.2096-6717.2019.008.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

4

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Segment deformation in shield tunnel construction considering process response
Cloud-edge-end architecture and application for intelligent detection of backfill grouting in shield tunnels
Active failure limit support force of shield tunnel excavation face in multi-layer soil
Parameter prediction method of shield slurry separation system by neural network based on wavelet denoising
Review and prospect of machine learning method in shield tunnel construction

Related Author

XU Zilong
LIN Wei
BU Xiangbo
ZENG Kun
XIE Xiongyao
SHI Zhou
XIE Xiongyao
LI Kang

Related Institution

Hangzhou Polytechnic
School of Safety Engineering and Emergency Management, Shijiazhuang Tiedao University
School of Civil Engineering, Tongji University
China Railway 15th Bureau Group Co. Ltd
College of Civil Engineering; Key Laboratory of Geotechnical and Underground of Ministry of Education, Tongji University
0