Experimental study on dredged slurry improvement by vacuum preloading combined with intermittent electroosmotic
|更新时间:2023-11-24
|
Experimental study on dredged slurry improvement by vacuum preloading combined with intermittent electroosmotic
Journal of Civil and Environmental EngineeringVol. 43, Issue 5, Pages: 1-9(2021)
作者机构:
作者简介:
基金信息:
National Key R&D Program of China(2016YFC0800200);National Natural Science Foundation of China(51878402);National Natural Science Foundation of China(51678352);National Natural Science Foundation of China(51778501);National Natural Science Foundation of China(51778500);National Natural Science Foundation of China(51620105008);Program of Science and Technology of Wenzhou(S20180002);Science and Technology Association of Wenzhou(2019KXCX-RH5)
Feiyu Liu, Zhe Li, Guohui Yuan, et al. Experimental study on dredged slurry improvement by vacuum preloading combined with intermittent electroosmotic[J]. Journal of Civil and Environmental Engineering, 2021, 43(5): 1-9.
DOI:
Feiyu Liu, Zhe Li, Guohui Yuan, et al. Experimental study on dredged slurry improvement by vacuum preloading combined with intermittent electroosmotic[J]. Journal of Civil and Environmental Engineering, 2021, 43(5): 1-9. DOI: 10.11835/j.issn.2096-6717.2020.064.
Experimental study on dredged slurry improvement by vacuum preloading combined with intermittent electroosmotic