Collaborative management of construction schedule based on deep learning 3D reconstruction technology
Digital Twins and Intelligent Construction|更新时间:2023-11-28
|
Collaborative management of construction schedule based on deep learning 3D reconstruction technology
“In the field of construction project management, an automated system based on deep learning 3D reconstruction technology (DLR-P) has been successfully developed. The system collects real-time image information through high-speed cameras and combines BIM dynamic modeling technology to achieve automated control of construction progress. Empirical research shows that the DLR-P system has significant advantages in operating costs and ease of use, effectively improving the efficiency of construction schedule management.”
Journal of Civil and Environmental EngineeringVol. 46, Issue 1, Pages: 173-181(2024)
作者机构:
重庆大学 管理科学与房地产学院,重庆 400045
作者简介:
brief: SU Yang (1993- ), main research interest: intelligent construction, E-mail: suyang0627@163.com.
MAO Chao (corresponding author), professor, doctorial supervisor, E-mail: maochao1201@cqu.edu.cn.
基金信息:
Special Cross and Application Improvement Project of Social Sciences for Basic Scientific Research Business Expenses of Central Universities(2021CDJSKJC22)
SU Yang,MAO Chao,GUO Pengfei.Collaborative management of construction schedule based on deep learning 3D reconstruction technology[J].Journal of Civil and Environmental Engineering,2024,46(01):173-181.
SU Yang,MAO Chao,GUO Pengfei.Collaborative management of construction schedule based on deep learning 3D reconstruction technology[J].Journal of Civil and Environmental Engineering,2024,46(01):173-181. DOI: 10.11835/j.issn.2096-6717.2021.141.
Collaborative management of construction schedule based on deep learning 3D reconstruction technology