您当前的位置:
首页 >
文章列表页 >
Long-term stability and hierarchical early warning scheme for high slope of railway cutting
更新时间:2023-11-25
    • Long-term stability and hierarchical early warning scheme for high slope of railway cutting

    • Journal of Civil and Environmental Engineering   Vol. 44, Issue 5, Pages: 67-77(2022)
    • DOI:10.11835/j.issn.2096-6717.2021.156    

      CLC:
    • Received:14 June 2021

      Published:2022-10

    移动端阅览

  • Jiafeng YANG, Peng XIAO. Long-term stability and hierarchical early warning scheme for high slope of railway cutting[J]. Journal of Civil and Environmental Engineering, 2022, 44(5): 67-77. DOI: 10.11835/j.issn.2096-6717.2021.156.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

5

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Inverse geometric reliability analysis algorithm for geotechnical structures
Normalized analysis for pile-raft load sharing ratio of piled raft foundation in homogeneous ground
Stability analysis of cohesive soil slope with weak interlayer under heavy rainfall
Formation mechanism and distribution of transient saturated areas of residual slope under rainfall conditions
Force analysis and security assessment of diaphragm walls adjacent overpasses

Related Author

LIU He
WU Xingzheng
Ling Wang
Ruping Luo
Zhongming He
Baolin Wang
Qingguo Hu
Hongyuan Fu

Related Institution

College of Civil Engineering and Architecture, Hebei University
0