您当前的位置:
首页 >
文章列表页 >
Prediction model of ground settlement caused by construction of double track parallel shield tunnels under arbitrary layout
Civil Engineering | 更新时间:2025-11-14
    • Prediction model of ground settlement caused by construction of double track parallel shield tunnels under arbitrary layout

    • In the field of tunnel engineering, experts have established a prediction model for surface settlement caused by the arbitrary arrangement of double line parallel shield tunnels, providing reference for predicting and controlling surface settlement deformation in similar tunnel engineering construction.
    • Journal of Civil and Environmental Engineering   Vol. 47, Issue 3, Pages: 113-125(2025)
    • DOI:10.11835/j.issn.2096-6717.2023.084    

      CLC: U455.43
    • Received:18 December 2022

      Published:25 June 2025

    移动端阅览

  • WANG Chao,ZOU Jinfeng.Prediction model of ground settlement caused by construction of double track parallel shield tunnels under arbitrary layout[J].Journal of Civil and Environmental Engineering,2025,47(03):113-125. DOI: 10.11835/j.issn.2096-6717.2023.084.

  •  
  •  

0

Views

5

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Prediction model for horizontal axis deviation of segment during construction stage of small curvature radius shield tunnel
Investigation of surface settlement induced by twin shield tunelling in silty fine sand stratum
Machine learning method for overall stability of welded constant section box columns made of high strength steel
Evolution characteristics and prediction model on suffusion of silty-sand subjected to seepage
Carbonation durability performance and carbonation prediction model of shotcrete permanent support structure after frost damage

Related Author

ZHU Chunzhou
LIU Huigang
DING Jianwen
GAO Shunyu
XIANG Longsheng
LIAO Zhaosheng
ZHOU Yi
MA Jun

Related Institution

China Railway Shanghai Design Institute Group Co., Ltd.
School of Transportation, Southeast University
CCCC Tunnel Engineering Company Limited
a. School of Mechanics and Civil Engineering; 1b. Jiangsu Key Laboratory of Environmental Disaster and Structural Reliability of Civil Engineering, China University of Mining and Technology, Xuzhou 221116, Jiangsu, P. R. China; 2. South Branch of China Construction Eighth Engineering Bureau Co., Ltd, Shenzhen 518035, Guangdong, P. R. China; 3. College of Civil Engineering, Southwest Jiaotong University, Chendu
中国矿业大学,江苏省土木工程环境灾变与结构可靠性重点实验室
0