您当前的位置:
首页 >
文章列表页 >
Prediction model for horizontal axis deviation of segment during construction stage of small curvature radius shield tunnel
Civil Engineering | 更新时间:2025-11-14
    • Prediction model for horizontal axis deviation of segment during construction stage of small curvature radius shield tunnel

    • In the field of shield tunnel construction, experts have established a prediction model for the horizontal axis offset of pipe segments under small curvature radius conditions based on a modified model, effectively solving the problem of offset calculation during the construction process.
    • Journal of Civil and Environmental Engineering   Vol. 47, Issue 3, Pages: 126-141(2025)
    • DOI:10.11835/j.issn.2096-6717.2023.100    

      CLC: U455.43
    • Received:20 February 2023

      Published:25 June 2025

    移动端阅览

  • ZHU Chunzhou.Prediction model for horizontal axis deviation of segment during construction stage of small curvature radius shield tunnel[J].Journal of Civil and Environmental Engineering,2025,47(03):126-141. DOI: 10.11835/j.issn.2096-6717.2023.100.

  •  
  •  

0

Views

6

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Prediction model of ground settlement caused by construction of double track parallel shield tunnels under arbitrary layout
Machine learning method for overall stability of welded constant section box columns made of high strength steel
Evolution characteristics and prediction model on suffusion of silty-sand subjected to seepage
Carbonation durability performance and carbonation prediction model of shotcrete permanent support structure after frost damage
Prediction model of lighting energy consumption and subjective evaluation of convenience stores in China

Related Author

ZOU Jinfeng
WANG Chao
ZHOU Yi
MA Jun
CHEN Peijian
XU Hao
ZHANG Yingying
MING Zexin

Related Institution

School of Civil Engineering, Central South University
a. School of Mechanics and Civil Engineering; 1b. Jiangsu Key Laboratory of Environmental Disaster and Structural Reliability of Civil Engineering, China University of Mining and Technology, Xuzhou 221116, Jiangsu, P. R. China; 2. South Branch of China Construction Eighth Engineering Bureau Co., Ltd, Shenzhen 518035, Guangdong, P. R. China; 3. College of Civil Engineering, Southwest Jiaotong University, Chendu
中国矿业大学,江苏省土木工程环境灾变与结构可靠性重点实验室
中国建筑第八工程局有限公司南方分公司
西南交通大学 土木工程学院
0