Segment deformation in shield tunnel construction considering process response
Civil Engineering|更新时间:2025-11-05
|
Segment deformation in shield tunnel construction considering process response
“In the field of shield tunneling in composite strata, experts have established a three-dimensional numerical calculation model of multi-source load coupling, revealing the deformation evolution mode of pipe segments, and providing solutions for solving the problems of pipe segment uplift displacement and over limit misalignment.”
Journal of Civil and Environmental EngineeringVol. 47, Issue 5, Pages: 155-166(2025)
作者机构:
1.同济大学 土木工程学院,上海 200092
2.石家庄铁道大学 安全工程与应急管理学院, 石家庄 050043
3.杭州科技职业技术学院,杭州 311402
作者简介:
SHI Zhou (1996- ), PhD candidate, main research interests: mechanism and intelligent control of shield tunnel segment floating, E-mail: shizhou19960910@163.com.
National Key R & D Program of China(2023YFC3806705);National Natural Science Foundation of China(52038008;52378408);Science and Technology Innovation Plan of Shanghai Science and Technology Commission(22dz1203004);State Grid Shanghai Municipal Electric Power Company(52090W23000B);General Research Project of Zhejiang Provincial Department of Education(Y202455611)
SHI Zhou,XIE Xiongyao,ZENG Kun,et al.Segment deformation in shield tunnel construction considering process response[J].Journal of Civil and Environmental Engineering,2025,47(05):155-166.
SHI Zhou,XIE Xiongyao,ZENG Kun,et al.Segment deformation in shield tunnel construction considering process response[J].Journal of Civil and Environmental Engineering,2025,47(05):155-166. DOI: 10.11835/j.issn.2096-6717.2025.006.
Segment deformation in shield tunnel construction considering process response