Zheng Xiaoqing. ON THE UTILITY SUM OF ACCUMULATED PRESENT VALUE FOR THE ECONOMIC EVALUATION OF INVESTMENT PROJECT[J]. Journal of Civil and Environmental Engineering, 1996, 18(1): 85-89.
Zheng Xiaoqing. ON THE UTILITY SUM OF ACCUMULATED PRESENT VALUE FOR THE ECONOMIC EVALUATION OF INVESTMENT PROJECT[J]. Journal of Civil and Environmental Engineering, 1996, 18(1): 85-89. DOI: 10.11835/j.issn.1674-4764.1996.01.012.
论投资项目经济评价的累计现值效用和值评价法
摘要
本文针对净现等指标的局限性,提出了累计现值效用和值指标。
Abstract
To counteract the weakness of Net Present Value
a new index
the utility sum of accumulated net-cash-flow present value