叶晓苏. BOT项目承包风险的综合评价方法[J]. 土木与环境工程学报(中英文), 1997,19(6):15-21.
A Comprehensive Evaluation Method of Contract Risk of BOT Project[J]. Journal of Civil and Environmental Engineering, 1997, 19(6): 15-21.
叶晓苏. BOT项目承包风险的综合评价方法[J]. 土木与环境工程学报(中英文), 1997,19(6):15-21. DOI: 10.11835/j.issn.1674-4764.1997.06.003.
A Comprehensive Evaluation Method of Contract Risk of BOT Project[J]. Journal of Civil and Environmental Engineering, 1997, 19(6): 15-21. DOI: 10.11835/j.issn.1674-4764.1997.06.003.
针对BOT项目建设、经营和移交中现存和潜在的风险,运用层次分析方法给出了BOT项目的风险模型,利用该方法我们能基于单一指标和考虑各层指标间不同仅重的重要性,作出BOT项目风险决策。
Concerning the existent and latent risk in building
operating and transfering of BOT project
the model of BOT risk is advanced in AHP way
and on the basis of sinqle target and the importance of the weiqht of each index affecting
the policy in the risk of the BOT project is made by the use of the method.