Study on the Sequence of Parts with Constrains of Earliness and Tardiness in Job-Shop[J]. Journal of Civil and Environmental Engineering, 1999, 21(3): 110-113.
Study on the Sequence of Parts with Constrains of Earliness and Tardiness in Job-Shop[J]. Journal of Civil and Environmental Engineering, 1999, 21(3): 110-113. DOI: 10.11835/j.issn.1674-4764.1999.03.023.