A Research of Life Cycle Integrated Management Pattern of Construction Project[J]. Journal of Civil and Environmental Engineering, 2001, 23(4): 75-80. DOI: 10.11835/j.issn.1674-4764.2001.04.015.
Project Management on behalf of the owner (OPM) in implementation phase and Facility Management (FM) in operation phase are three isolated management tools during traditional life cycle management of construction project. As a result
a lot of potential disadvantages are aroused. In recent years
many research organizations try to reform the traditional method using different integration means. This paper tries to explore into integration of DM
OPM and FM to overcome the malpractice of traditional life cycle management of construction project. The research focuses on three aspects: 1.putting forward the concept of Life Cycle Integrated Management (LCIM)
based on management integration theory; 2. Raising a new idea to owner's (operator's) management organization design
which emphasizes on the balance of life cycle objectives; 3. Analyzing an information module
level and method of system integration of Life Cycle Integrated Management Information System.