Study on the Ship Navigation Process after Construction of the Yangtze River Bridge in Sutong City[J]. Journal of Civil and Environmental Engineering, 2001, 23(5): 45-49.
Study on the Ship Navigation Process after Construction of the Yangtze River Bridge in Sutong City[J]. Journal of Civil and Environmental Engineering, 2001, 23(5): 45-49. DOI: 10.11835/j.issn.1674-4764.2001.05.010.
the equations of ship and current motion model are established. The calculation of the ship manipulative capability parameter is consistent with the measured in static stream. Through the ship motion model
the layout of the navigation route and the change of the ship manipulative capability parameter due to the Yangtze River Bridge in Sutong City are studied.