Settlement Analysis on Building near Retaining Pile of Deep Foundation Pit[J]. Journal of Civil and Environmental Engineering, 2006, 28(2): 52-55. DOI: 10.11835/j.issn.1674-4764.2006.02.015.
The building settlement near a foundation pit project in Yanzhou is calculated by using calculation method related to settlement of the soil near a foundation pit
Comparing and analyzing calculated settlement values with measured settlement
the reason for the gap between theoretically calculated values and measured settlement values is pointed out
On the foundation of careful research and analysis of the measured building settlement values
the factors influencing the settlement of building near the foundation pit are summarized. Finally
according to practical measured values and influ- encing factors
how the settlement of building near the foundation pit is influenced was carefully analyzed. A conclusion that has practical role in Engineering is presented
which can serve reasonably for instructing foundation pit retaining design.