Objective Integration Plan and Performance Measurement Method Based on Project Triangle[J]. Journal of Civil and Environmental Engineering, 2006, 28(5): 122-125.
Objective Integration Plan and Performance Measurement Method Based on Project Triangle[J]. Journal of Civil and Environmental Engineering, 2006, 28(5): 122-125. DOI: 10.11835/j.issn.1674-4764.2006.05.029.
the plan of objective and the measurement of performance is the key content of objective control.Only having an integrated plan and measurement of objective
the realization of project objective can be successfully achieved.