Comprehensive Control Technique of Reliability in Large Construction Project Management[J]. Journal of Civil and Environmental Engineering, 2007, 29(2): 132-134.
Comprehensive Control Technique of Reliability in Large Construction Project Management[J]. Journal of Civil and Environmental Engineering, 2007, 29(2): 132-134. DOI: 10.11835/j.issn.1674-4764.2007.02.033.
After analyzing the current researches with the three-major-goal management: quality
cost and time
on the construction project and aiming at the existing issues
this article puts forward a new method.This method identifies the reliability of every fundamental module(subsystem) suitably
which based on the current standards to analyze and classify the large construction procedure
and was constituted by the construction procedure.Also was considered the three-major-goal(quality
cost and time) of every module.Then the reliability of the large construction project was calculated
the qualified standards of reliability were evaluated
and the general and particular frame was optimized.Furthermore
it raises a new conception of the comprehensive control technique considering the reliability of the three-major-goal synthetically.This article explores a new way to ensure the three major unified goals: quality
cost and time
of the construction project management
and makes sure that the process of the construction project was in an ideal condition.