ZHU Chunzhou.Prediction model for horizontal axis deviation of segment during construction stage of small curvature radius shield tunnel[J].Journal of Civil and Environmental Engineering,2025,47(03):126-141.
ZHU Chunzhou.Prediction model for horizontal axis deviation of segment during construction stage of small curvature radius shield tunnel[J].Journal of Civil and Environmental Engineering,2025,47(03):126-141. DOI: 10.11835/j.issn.2096-6717.2023.100.