您当前的位置:
首页 >
文章列表页 >
Effect of partial leakage during deep excavation in water-rich sandy strata on retaining wall deformation and ground settlement
更新时间:2025-02-21
    • Effect of partial leakage during deep excavation in water-rich sandy strata on retaining wall deformation and ground settlement

    • “Reporting on the latest advancements in geotechnical engineering, this paper delves into the stability of deep foundation pits in water-rich sandy strata, a critical aspect of underground construction safety. The research, grounded in the analysis of subway station launch shaft pit leakage incidents, reveals that partial leakage significantly amplifies retaining wall displacement and ground settlement, with the maximum values post-leakage being 1.29 to 1.47 times and 1.16 to 2.67 times the pre-leakage measurements, respectively. The study underscores the "jump" fluctuation in groundwater level as a key indicator of impending leakage disasters and proposes a combined grouting and high-pressure jet spouting pile treatment as an effective solution for managing leakage in such strata.”
    • Journal of Civil and Environmental Engineering   Pages: 1-16(2025)
    • DOI:10.11835/j.issn.2096-6717.2024.123    

      CLC: TU751
    • Received:24 September 2024,

      Online First:21 February 2025,

    移动端阅览

  • QIU Mingming,LI Xiaomin,ZHAO Haifeng,et al.Effect of partial leakage during deep excavation in water-rich sandy strata on retaining wall deformation and ground settlement[J].Journal of Civil and Environmental Engineering, DOI:10.11835/j.issn.2096-6717.2024.123.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Deterioration of grotto temple rock masses: A review of mechanisms, experimentations, modeling and conservation measures
Machine learning-based investigation of uplift resistance in special-shaped shield tunnels using numerical finite element modeling

Related Author

ZHANG Wengang
HAO Zeyi
WANG Shuo
XIONG Zihua
JIANG Siwei
ZHAO Gang
ZHANG Wengang
YE Wenyu

Related Institution

School of Civil Engineering
Key Laboratory of New Technology for Construction of Cities in Mountain Area, Ministry of Education
National Joint Engineering Research Center of Geohazards Prevention in the Reservoir Areas
Chongqing Field Scientific Observation Station for Landslide Hazards in Three Gorges Reservoir Area, Chongqing University
Dazu Rock Carving Research Institute
0