您当前的位置:
首页 >
文章列表页 >
A dynamic control method for shield tunneling parameter thresholds based on decoupling analysis of boreability
更新时间:2025-08-19
    • A dynamic control method for shield tunneling parameter thresholds based on decoupling analysis of boreability

    • “In the field of shield tunneling, experts adopt a combined two factor method to decouple geological parameters from rock mass excavatability, achieve dynamic suppression of cutterhead torque, and provide decision-making instructions for risk control of tunneling parameter fluctuations.”
    • Journal of Civil and Environmental Engineering   Pages: 1-11(2025)
    • DOI:10.11835/j.issn.2096-6717.2025.069    

      CLC: U455.43
    • Received:17 March 2025,

      Online First:19 August 2025,

    移动端阅览

  • WANG Jianjun,LI Tong,RONG Xuening,et al.A dynamic control method for shield tunneling parameter thresholds based on decoupling analysis of boreability[J].Journal of Civil and Environmental Engineering, DOI:10.11835/j.issn.2096-6717.2025.069.

  •  
  •  

0

Views

2

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Threshold of the disturbance to residents indoor activities by colored light from urban lighting

Related Author

Juan Yu
Lixiong Wang
Mingyu Zhang
Jieqiao Song
Di Yang

Related Institution

No data
0